Callan Marine Sets House on CSD General Arnold
Photo courtesy of Callan Marine.
Callan Marine recently launched the hull and set the house on the 32" cutter suction dredge General Arnold. The General Arnold is on schedule for launch in 2023 and will join Callan Marine’s additional 32” CSD, General MacArthur.
At 290’ feet in length and 72’ feet wide, the General Arnold will have a maximum digging depth of 97 feet and a dredge pipe diameter of 31 inches. Under construction at C&C Shipyard in Belle Chasse, La., the diesel-electric driven General Arnold will boast 24,000 horsepower. It will also feature advanced production automation and monitoring systems.
“Callan Marine continues to build dredges that meet the needs of our coastal partners and ongoing maintenance dredging needs across the nation,” stated Maxie McGuire, president of Callan Marine. “The General Arnold will have an impressive capacity for work and will join the 32” CSD General MacArthur as a powerful leader in our fleet.”
The General Arnold will be the sixth cutter suction dredge in Callan Marine’s asset inventory. Other dredges include the 32” General MacArthur, the 28” General Bradley, the 18” General Pershing, the 16” General Patton, and the 12” General Eisenhower. The 18” CSD General Marshall remains on the construction timeline for Callan Marine as well.
Callan Marine serves public and private clients by providing crucial dredging services and executing new maritime construction and expansion projects. They restore berthing depths for ship docks and navigation channels, facilitating transportation in the nation’s waterways.